Home/News/Details

UK Proposes Comprehensive Ban on PFAS in Firefighting Foams

Jul 22, 2026
UK
PFAS
Favorite
Share
Unlock exclusive content and benefits? Sign up for free today!

On July 21, 2026, the UK Health and Safety Executive (HSE) published its agency opinion on the restriction proposal for per- and polyfluoroalkyl substances (PFAS) in firefighting foams, formally launching a 60-day public consultation. The consultation will close on September 7, 2026.

Key Conclusion

In its opinion, HSE explicitly states that the use of PFAS in firefighting foams poses risks to the environment and human health (via environmental pathways), and that existing regulatory measures are insufficient to adequately control this risk. The agency recommends implementing a restriction under UK REACH regulations in Great Britain (GB).

Three Restriction Options

HSE has proposed three restriction options, with the core differences lying in the treatment of unused stockpiles and waste:

Option

Core Measures

30-Year Emission Reduction

Estimated Cost

RO1

Ban on placing on the market and use of PFAS firefighting foams ≥1 mg/L, with transition periods and management plans

529 tonnes (35%)

£613 million

RO2a

RO1 + mandatory collection and high-temperature incineration of unused stockpiles

1,368 tonnes (91%)

£696 million

RO2b

RO2a + extension to PFAS-containing waste and wastewater from use

1,422 tonnes (94%)

£704 million

HSE favors recommending Option RO2a, believing it strikes the optimal balance between cost-effectiveness and emission reduction outcomes.

Sector-Specific Transition Periods

To ensure fire safety is not compromised during the transition, HSE has established differentiated transition periods for various sectors:

  • Portable fire extinguishers: 6 months for placing on the market / 5 years for use
  • Fire and rescue services: 18 months (extendable to 10 years for COMAH sites)
  • Civil aviation: 5 years
  • Defence (land-based): 5 years
  • Petrochemical/chemical COMAH facilities: 10 years (most complex retrofitting requirements)
  • Offshore oil and gas installations: 10 years (challenges include space constraints and seawater compatibility)
  • Civilian/military vessels: 10 years (to align with dry-dock maintenance cycles)

Public Consultation

This consultation seeks input solely on socioeconomic factors. HSE particularly welcomes information and evidence regarding:

  • Specific data on transition costs
  • Technical feasibility and availability of alternative foams
  • High-temperature incineration (HTI) disposal capacity and costs
  • Practical challenges of transition across various sectors

 

Further information

HSE

ChemRadar Copyright Disclaimers:

1. All texts, graphics, videos and audios with "Source: ChemRadar" on this website are copyrighted by ChemRadar. Without authorization, no media, website or individual is allowed to reproduce, link, distribute, publish, or copy any content in this website. Other media, website with our authorization shall indicate "Source: CIRS Group" when downloading or using relevant contents. Unauthorized actions will be persecuted.

2. Texts and graphics on thie website without "Source: ChemRadar" are reproduced for further information but not imply the endorsement of views or autheticity of its content. Other media, websites or individuals download or use relevant content shall remain its "Source" as prescribed in this website and bear corresponding legal responsibilities. Any unauthorized alternation to "Source: ChemRadar" may be persecuted. If you have any questions about relevant content on this website, please contact us.

3. If any content reproduced on ChemRadar raises copyright or other related issues, please contact us within two weeks.

Disclaimer
1.
CIRS aims to keep the content of this site accurate and up to date. However, CIRS makes no warranties or representations regarding the quality, accuracy, completeness or reliability of information on the site.
2.
In no event shall CIRS assume or have any responsibility or liability for any information on this site or for any claims, damages or losses resulting from their use.
3.
CIRS reserves the right, at our discretion, to change, modify, add to, or remove portions of information on this site at any time without notice.
icon-server
Hot Services
message
in