Home/News/Details

India Announces Emergency Extension! Buffer Period for New Regulations on Three Types of Chemical Packaging Sacks Extended to September

Jun 25, 2025
India
BIS
Favorites
Share
Unlock exclusive content and benefits? Sign up for free today!

On June 11, 2025, the Department of Chemicals and Petrochemicals (DCPC) of India recently announced a significant policy adjustment, postponing the implementation date of mandatory Quality Control Orders (QCOs) for packaging sacks of three specific chemicals. This move grants domestic manufacturers a crucial adaptation period.

Goods or Items

Indian Standards

Implementation Date

High Density

Polyethylene (HDPE) / Polypropylene (PP) Woven Sacks for Packaging of 50 kg Cement

IS 11652:2017 Textiles — High Density

Polyethylene (HDPE) / Polypropylene (PP) Woven Sacks for Packaging of 50 kg-

Specification(Third Revision)

September 6, 2025

Polypropylene (PP) Woven, Laminated, Block Bottom Valve Sacks for Packaging 50 kg Cement

IS 16709:2017 Textiles —Polypropylene (PP) Woven, Laminated, Block Bottom Valve Sacks for Packaging 50 kg Cement-

Specification

Polypropylene (PP)/ High Density Polyethylene (HDPE) Laminated Woven Sacks for Mail Sorting, Storage, Transport

and Distribution

IS 17399:2020 Textiles —Polypropylene (PP)/ High Density Polyethylene (HDPE) Laminated Woven Sacks for Mail Sorting, Storage, Transport and Distribution-

Specification

Once these QCOs are implemented, manufacturers of these chemicals must apply for licenses from the Bureau of Indian Standards (BIS). The products must bear the standard mark under the license. The orders do not apply to chemicals intended for export only. All relevant manufacturers must comply with these new orders. Those who fails to comply with the orders shall be penalized in accordance with the provisions of the Bureau of Indian Standards Act (BIS Act), 2016.

Industry Impact

The extension provides India’s domestic woven sack producers—particularly those serving the cement industry and postal sector—with additional preparation time. Enterprises must utilize this period to adjust production processes, ensure full compliance with new national standards, and complete the necessary BIS license application procedures. The policy aims to enhance the quality and safety of related packaging products while setting a buffer period to ensure a smooth transition with minimal supply chain disruption.

 

CIRS Group offers consultation services for India BIS certification, including:

  • Authorised Indian Representative (AIR)
  • India ISI Certification Consulting and Training
  • India ISI Certificate Application
  • India ISI Certificate Renewal
  • India CRS Registration Consulting and Training
  • India CRS Registration Application
  • India CRS Registration Renewal

 

Further Information

DCPC

ChemRadar Copyright Disclaimers:

1. All texts, graphics, videos and audios with "Source: ChemRadar" on this website are copyrighted by ChemRadar. Without authorization, no media, website or individual is allowed to reproduce, link, distribute, publish, or copy any content in this website. Other media, website with our authorization shall indicate "Source: CIRS Group" when downloading or using relevant contents. Unauthorized actions will be persecuted.

2. Texts and graphics on thie website without "Source: ChemRadar" are reproduced for further information but not imply the endorsement of views or autheticity of its content. Other media, websites or individuals download or use relevant content shall remain its "Source" as prescribed in this website and bear corresponding legal responsibilities. Any unauthorized alternation to "Source: ChemRadar" may be persecuted. If you have any questions about relevant content on this website, please contact us.

3. If any content reproduced on ChemRadar raises copyright or other related issues, please contact us within two weeks.

Disclaimers
1.
CIRS aims to keep the content of this site accurate and up to date. However, CIRS makes no warranties or representations regarding the quality, accuracy, completeness or reliability of information on the site.
2.
In no event shall CIRS assume or have any responsibility or liability for any information on this site or for any claims, damages or losses resulting from their use.
3.
CIRS reserves the right, at our discretion, to change, modify, add to, or remove portions of information on this site at any time without notice.
Feedbacks
Service Hotline